There are several work alerts we need to share regarding various repairs and capital asset replacements to be done throughout the community this summer.
- Water Shutoff Repairs: To bring us into compliance with Munroe Falls City Ordinances, contractors Kline & Kavali will excavate to locate or install water shutoff valves (curb stops) at the following addresses: 154/185 Lake Terrace Drive and at 88/93 Silver Valley Blvd.
- Stoop Repairs: Masonry contractors from Chimnee Cricket will address several repair issues at the front stoops of the following addresses by Mid-August: 88, 94, 96, 98, 100, and 112 Ridge Side Court and 160, 168, and 170 Lake Terrace Drive.
- Stucco Repairs: Stucco repair contractor Jessie LaVoie will repair and paint several damaged stucco areas during the weeks of July 23 or August 6.
- Street Concrete Repairs: Hills Construction Concrete will repair and re-pave sections of Ridge Side Court and Olson Spur in August, the exact dates yet to be determined.
Updates to come.