Erosion control measures have started on the hillside between Olson Spur and Silver Valley Blvd. We are aware that this area was pretty unsightly after the dead, damaged, and dying trees were removed eartlier this year.
Thankfully, crews are busy cleaning, clearing, and planting the hill, and adding rock and gravel to better channel and control the heavy erosion damage we have experienced from extremely heavy stormwater runoff.
There are several more drainage and landscaping issues being studied (and bid) right now, including replacement of the pathetic retaining wall between Silver Valley and Olson Spur.